Middle River Road Box Culvert

View all

Project

Middle River Road Box Culvert


The Middle River Road Bridge was a replacement and drainage improvement project. The existing structure was replaced with a new box culvert, parapets and a new guide rail system.

As of November 2020, the Middle River Road Bridge/Culvert was awarded to Hemlock Construction through our CROOG/Gordian Contract. Hemlock Construction has demobilized the detour, and signage has been removed and the road is open. Hemlock completed the project on schedule within budget. Final Inspection was held attended by the designer Stantec Engineering, City of Danbury Engineering, Construction Services and Hemlock Construction. The structure was accepted with zero items on the punch list. The project was inspected and administrated by Construction Services Division